High pressure inflation priority management board
Inflation priority management set
The overflow valve allows you to give priority to the inflation of the dive blocks when the pressure in the buffer cylinders is too low.
With this system, as soon as the pressure is below 240 bars* in your buffer tank racks, the compressor inflates the dive blocks directly before reinflating the buffer tanks. The time to inflate the blocks is therefore very fast and you do not have to wait for the compressor to inflate simultaneously the volume of your diving blocks + the volume of the buffer tanks.
This technology has been used since 2001 in fire and rescue centers and allows in a simple and automatic way to avoid having to manage isolation valves. The use of a spillway plate makes it possible to relegate the technique of cascade inflation via valve manipulation to the time of prehistory.
The system is designed to allow the buffers to be emptied completely if necessary in order to optimize your inflation times.
Specify the type of inlet/outlet connection when ordering: 8S, 6S or COLTRI type.
* Adjustable pressure according to your needs.
304L stainless steel plate allowing also the optional addition of a pressure relief station for inflation ramp and safety valve for inflation ramp (consult us).